How do I decide whether to redo work after a requirement was missed?
Quick answer
Compare the missed requirement with the work’s intended outcome, then assess what happens if you leave it as is. Consider who or what is affected, whether a smaller revision would resolve the gap, and the time or disruption each option involves. If the consequences are unclear, summarize the gap neutrally and ask the relevant decision-maker what outcome matters most before redoing the work.
The question, the details, the next step.
A practical checklist
Quote or paraphrase the specific requirement and confirm it still applies.
Describe the current work and the gap using observable details.
State the intended outcome and any likely consequences, separating facts from assumptions.
Compare full redo, targeted revision, and acceptance, including effort and disruption.
Ask the person with decision authority to choose when the impact or acceptable deviation is unclear.
Record the decision, owner, and next step.
A few more useful answers
Should I start redoing the work while I wait for a decision?
Avoid extensive rework if the choice could change what needs to be done. If useful, prepare a small, reversible correction or outline the options, then confirm the priority before investing more effort.
What if the requirement was vague or changed after the work began?
Note the wording or change and when it became clear, then ask which version should govern the work. Treat the mismatch as a clarification issue rather than assuming someone acted carelessly.
What if I think the work is acceptable but someone else wants it redone?
Ask what outcome or concern makes a redo necessary, then clarify the scope and acceptance criteria. You can share the consequences of each option without presenting your preference as the only reasonable choice.